TeardownSeptember 28, 20261 min read

Mercury injected underground 'forever': a teardown of VLS Texas Molecular's disposal claim

The U.S. has had nowhere to put elemental mercury since the export ban. A Deer Park, Texas facility now stabilises it and injects it deep underground. It fills a real gap — with an undisclosed chemistry and a 10,000-year model.

Mercury injected underground 'forever': a teardown of VLS Texas Molecular's disposal claim
01

Elemental mercury is a liquid metal that evaporates at room temperature and damages the nervous system. Since the Mercury Export Ban Act (signed 2008, effective 2013) stopped exports, U.S. industries and agencies have had no disposal route — only indefinite, costly storage. VLS Environmental Solutions says it has now closed that gap.

02

The process

10,000 years
No Migration Petition period approved for the injection wells
  1. Acceptance at the RCRA-permitted treatment, storage and disposal facility in Deer Park, Texas, operating since 1981.
  2. Conversion by patent-pending technology into a "stable mercury solution". No reagents or product chemistry are disclosed.
  3. Injection via a Class I hazardous waste deep well into porous rock far below drinking-water aquifers.
  4. Certificate stating the material is "permanently removed from the biosphere".

Other figures: 175+ million gallons of annual capacity across all waste types; 67+ million gallons of "mercury-contaminated waste" disposed since 2021; permits from TCEQ and EPA.

Deep well injection relies on confining rock layers to keep waste in place.
Deep well injection relies on confining rock layers to keep waste in place.Photo: USGS, public domain
03

What is solid

This is a genuine regulatory gap, and a compliant domestic route beats warehouses full of flasks. Class I injection is established technology for hazardous waste, and a No Migration Petition requires serious geological modelling.

04

What is missing

Claimed

Mercury is permanently removed from the biosphere.

Actually

Permanence rests on geological modelling. No one has monitored a Class I well for 10,000 years, and the conversion chemistry is secret.

  • What is injected? Mercury sulfide (HgS) is the most stable form. Is that the product? The company does not say.
  • Well integrity. Casings and cement degrade; induced seismicity can open pathways.
  • Location. A single site on the hurricane-prone Gulf Coast.
  • Volumes. The 67 million gallons likely include other wastes; elemental mercury tonnage is not stated.
  • Single point of failure. If Deer Park closes, the U.S. is back to zero options.
  • Monitoring. No independent environmental monitoring data is published to support "no-discharge".
The alternative until now: indefinite storage of mercury stockpiles.
The alternative until now: indefinite storage of mercury stockpiles.Photo: Gemapro, CC BY-SA 4.0, via Wikimedia Commons
05

The read

Better than storage, probably. "Permanent" is a model output, not an observation. Publishing the stabilised chemistry and ongoing monitoring data would turn a marketing claim into an evidence-based one.

References and image credits›
  1. 01VLS Environmental Solutions — Mercury disposal
  2. 02American Recycler — VLS launches mercury disposal solution

Photo: USGS, public domain · Photo: Gemapro, CC BY-SA 4.0, via Wikimedia Commons